TRAFFIC ADVISORY: Full Road Closure inside the Krog Street Tunnel due to Investigative Work for Stormwater Project
What: Investigative work inside the Krog Street Tunnel for the design phase of Krog Street Tunnel Stormwater Project Phase II
Where: 1 Krog Street NE
When: Monday, February 12, 2024, and will continue for approximately two weeks from 7 p.m. to 6 a.m., Monday through Friday
Comments: Traffic control measures will be in place to guide motorists around the work zone. Motorists are urged to use caution when traveling near the work zone. Residents will continue to have access to mail and package delivery, emergency services and trash pick-up.
Detour: Traffic heading west on Dekalb Avenue NE will turn right onto Krog Street NE and left onto Edgewood Avenue SE and turn left onto Boulevard NE and continue south to Memorial Drive SE. Traffic on Wylie Street SE will be routed to use Pearl Street SE heading south to turn right onto Memorial Drive SE heading west and turning right onto Boulevard SE heading northwest to Dekalb Avenue NE.